Beautypoint Foreshore Seawall Restoration
One Earth was selected by the West Tamar Council for the renewal of the Beauty Point Foreshore Seawall Embankment. The works included removing 750 cubic metres of existing embankment material, excavating a new keyway while working with tidal movements, lining the wall with a heavyweight geofabric for erosion and protection, and placing 1450 ton of rock armor along the wall. A new pedestrian footpath and fencing were also constructed, providing new infrastructure for the area.